{"id":4308,"date":"2020-09-23T15:14:37","date_gmt":"2020-09-23T18:14:37","guid":{"rendered":"https:\/\/timesheet.dovico.com\/blog\/?p=4308"},"modified":"2021-07-15T16:03:49","modified_gmt":"2021-07-15T19:03:49","slug":"project-management-101-what-is-the-iron-triangle","status":"publish","type":"post","link":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/","title":{"rendered":"Project Management 101: What is the Iron Triangle?"},"content":{"rendered":"\n<p>In project management, there&#8217;s a model called the <em>project management triangle<\/em> or <em>iron triangle<\/em>. To achieve quality with a project, project managers are constantly balancing scope, time and costs. These three constraints of a project make up the three corners, or sides of the triangle. Quality is at the center, and when one side is longer than the other, the symmetry of the triangle is disturbed, and thus quality is threatened.<\/p>\n\n\n\n<div class=\"wp-block-image is-style-default\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"533\" height=\"545\" src=\"https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2021\/04\/pmtriangle.png\" alt=\"\" class=\"wp-image-4744\" srcset=\"https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2021\/04\/pmtriangle.png 533w, https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2021\/04\/pmtriangle-293x300.png 293w, https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2021\/04\/pmtriangle-50x50.png 50w\" sizes=\"auto, (max-width: 533px) 100vw, 533px\" \/><\/figure><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-the-three-sides-of-the-iron-triangle\">The three sides of the iron triangle.<\/h3>\n\n\n\n<p><strong>Scope<\/strong>: The specific features, objectives and requirements of a project that need to be delivered.<\/p>\n\n\n\n<p><strong>Time<\/strong>: The total estimated time to complete each task within the scope of the project.<\/p>\n\n\n\n<p><strong>Costs<\/strong>: Estimated labour rates, overhead, materials each can factor in the costs associated with a project.<\/p>\n\n\n\n<div class=\"wp-block-ugb-spacer ugb-spacer ugb-b507626 ugb-spacer--v2 ugb-main-block\"><div class=\"ugb-inner-block\"><div class=\"ugb-block-content\"><div class=\"ugb-spacer--inner\"><\/div><\/div><\/div><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-good-fast-cheap-choose-two\">&#8220;Good, fast, cheap. Choose two.&#8221;<\/h3>\n\n\n\n<div class=\"wp-block-ugb-spacer ugb-spacer ugb-5c74ff8 ugb-spacer--v2 ugb-main-block\"><div class=\"ugb-inner-block\"><div class=\"ugb-block-content\"><div class=\"ugb-spacer--inner\"><\/div><\/div><\/div><\/div>\n\n\n\n<p>In theory, to achieve the highest quality, there is an ideal trade-off between cost, scope and time. But in reality, trade-offs are not always possible. Projects often run longer on time, and if the budget can&#8217;t be increased or scope trimmed, quality suffers. Alternatively, a project can be sped up with added costs and changes to scope.<\/p>\n\n\n\n<p><em><strong>Good <\/strong>and <strong>fast <\/strong>is not <strong>cheap<\/strong>.<\/em><\/p>\n\n\n\n<p><em><strong>Fast <\/strong>and <strong>cheap <\/strong>is never <strong>good<\/strong>.<\/em><\/p>\n\n\n\n<p><em><strong>Cheap <\/strong>and <strong>good <\/strong>is rarely <strong>fast<\/strong>.<\/em><\/p>\n\n\n\n<p>The quality of work is finite to perfection. Yet, cost, scope, and time are infinitely exchanged within a project. Project managers are continually trading between the triangle&#8217;s constraints to achieve the best quality they can.<\/p>\n\n\n\n<div class=\"wp-block-ugb-spacer ugb-spacer ugb-b2c7c26 ugb-spacer--v2 ugb-main-block\"><div class=\"ugb-inner-block\"><div class=\"ugb-block-content\"><div class=\"ugb-spacer--inner\"><\/div><\/div><\/div><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-quality-of-the-project-management-triangle-does-not-define-a-project-s-success\">Quality of the project management triangle does not define a project&#8217;s success.<\/h3>\n\n\n\n<div class=\"wp-block-ugb-spacer ugb-spacer ugb-668e0bc ugb-spacer--v2 ugb-main-block\"><div class=\"ugb-inner-block\"><div class=\"ugb-block-content\"><div class=\"ugb-spacer--inner\"><\/div><\/div><\/div><\/div>\n\n\n\n<p>The project management triangle is often used to define a project&#8217;s success by delivering the scope within the constraints. Delivering a product&#8217;s scope on-time and within a budget does not necessarily represent a project&#8217;s success. There are many factors, such as knowledge-gathering, user satisfaction, and any impact the project has on important stakeholders that come in to play.<\/p>\n\n\n\n<div class=\"wp-block-ugb-spacer ugb-spacer ugb-d99d255 ugb-spacer--v2 ugb-main-block\"><div class=\"ugb-inner-block\"><div class=\"ugb-block-content\"><div class=\"ugb-spacer--inner\"><\/div><\/div><\/div><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-in-conclusion\">In conclusion<\/h3>\n\n\n\n<div class=\"wp-block-ugb-spacer ugb-spacer ugb-0e32e80 ugb-spacer--v2 ugb-main-block\"><div class=\"ugb-inner-block\"><div class=\"ugb-block-content\"><div class=\"ugb-spacer--inner\"><\/div><\/div><\/div><\/div>\n\n\n\n<p>The project management triangle is a visual representation of the three fundamental constraints that are a part of almost any project. While some constraints may be laxer than others, they are still factors. Projects of high quality are rarely the product of limitless scope, infinite time and bottomless budgets. There are limits in real life, and finding the right tools, such as <a href=\"https:\/\/www.dovico.com\/free-trial\/\" target=\"_blank\" rel=\"noreferrer noopener\">online employee time and expense sheet system<\/a>, goes a long way in delivering quality work within those limits.<\/p>\n\n\n\n<p>While success is not ultimately tied to the quality of a project, failure certainly is. When a project&#8217;s constraints are allowed to run amok, the triangle becomes unbalanced, and quality suffers. When quality suffers for long enough, success is nearly impossible to achieve.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In project management, there&#8217;s a model called the project management triangle or iron triangle. To achieve quality with a project, project managers are constantly balancing scope, time and costs. These three constraints of a project make up the three corners, or sides of the triangle. Quality is at the center, and when one side is longer than the other, the symmetry of the triangle is disturbed, and thus quality is threatened. The three sides of&#8230;<\/p>\n","protected":false},"author":3,"featured_media":4321,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-4308","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-productivity"],"featured_image_urls_v2":{"full":["https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-scaled.jpg",2560,1442,false],"thumbnail":["https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-150x150.jpg",150,150,true],"medium":["https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-300x169.jpg",300,169,true],"medium_large":["https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-768x433.jpg",768,433,true],"large":["https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-1024x577.jpg",1024,577,true],"1536x1536":["https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-1536x865.jpg",1536,865,true],"2048x2048":["https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-2048x1154.jpg",2048,1154,true],"thoughts-blog":["https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-700x500.jpg",700,500,true],"thoughts-header":["https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-1280x1024.jpg",1280,1024,true]},"post_excerpt_stackable_v2":"<p>In project management, there&#8217;s a model called the project management triangle or iron triangle. To achieve quality with a project, project managers are constantly balancing scope, time and costs. These three constraints of a project make up the three corners, or sides of the triangle. Quality is at the center, and when one side is longer than the other, the symmetry of the triangle is disturbed, and thus quality is threatened. The three sides of the iron triangle. Scope: The specific features, objectives and requirements of a project that need to be delivered. Time: The total estimated time to complete&hellip;<\/p>\n","category_list_v2":"<a href=\"https:\/\/timesheet.dovico.com\/blog\/category\/productivity\/\" rel=\"category tag\">Productivity<\/a>","author_info_v2":{"name":"Dovico","url":"https:\/\/timesheet.dovico.com\/blog\/author\/ejohnston\/"},"comments_num_v2":"0 comments","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Project Management 101: What is the Iron Triangle? - Dovico Blog<\/title>\n<meta name=\"description\" content=\"What is the project management triangle? Balancing time, costs and scope are three keys to project quality. Read more about the iron triangle\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project Management 101: What is the Iron Triangle? - Dovico Blog\" \/>\n<meta property=\"og:description\" content=\"What is the project management triangle? Balancing time, costs and scope are three keys to project quality. Read more about the iron triangle\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/\" \/>\n<meta property=\"og:site_name\" content=\"Dovico Blog\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-23T18:14:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-07-15T19:03:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-scaled.jpg?fit=2560%2C1442&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1442\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Dovico\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dovico\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/\",\"url\":\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/\",\"name\":\"Project Management 101: What is the Iron Triangle? - Dovico Blog\",\"isPartOf\":{\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-scaled.jpg\",\"datePublished\":\"2020-09-23T18:14:37+00:00\",\"dateModified\":\"2021-07-15T19:03:49+00:00\",\"author\":{\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/#\/schema\/person\/f3b591bcd0171f30ebf2582d9be2551d\"},\"description\":\"What is the project management triangle? Balancing time, costs and scope are three keys to project quality. Read more about the iron triangle\",\"breadcrumb\":{\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#primaryimage\",\"url\":\"https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-scaled.jpg\",\"contentUrl\":\"https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-scaled.jpg\",\"width\":2560,\"height\":1442},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/timesheet.dovico.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Management 101: What is the Iron Triangle?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/#website\",\"url\":\"https:\/\/timesheet.dovico.com\/blog\/\",\"name\":\"Dovico Blog\",\"description\":\"Give Time Meaning.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/timesheet.dovico.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/timesheet.dovico.com\/blog\/#\/schema\/person\/f3b591bcd0171f30ebf2582d9be2551d\",\"name\":\"Dovico\",\"description\":\"Helping teams track time and manage projects since 1993. Dovico\u2019s timesheet software makes time tracking simple, insightful, and scalable. Learn more at dovico.com.\",\"sameAs\":[\"https:\/\/www.dovico.com\"],\"url\":\"https:\/\/timesheet.dovico.com\/blog\/author\/ejohnston\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project Management 101: What is the Iron Triangle? - Dovico Blog","description":"What is the project management triangle? Balancing time, costs and scope are three keys to project quality. Read more about the iron triangle","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/","og_locale":"en_US","og_type":"article","og_title":"Project Management 101: What is the Iron Triangle? - Dovico Blog","og_description":"What is the project management triangle? Balancing time, costs and scope are three keys to project quality. Read more about the iron triangle","og_url":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/","og_site_name":"Dovico Blog","article_published_time":"2020-09-23T18:14:37+00:00","article_modified_time":"2021-07-15T19:03:49+00:00","og_image":[{"width":2560,"height":1442,"url":"https:\/\/i0.wp.com\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-scaled.jpg?fit=2560%2C1442&ssl=1","type":"image\/jpeg"}],"author":"Dovico","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dovico","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/","url":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/","name":"Project Management 101: What is the Iron Triangle? - Dovico Blog","isPartOf":{"@id":"https:\/\/timesheet.dovico.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#primaryimage"},"image":{"@id":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#primaryimage"},"thumbnailUrl":"https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-scaled.jpg","datePublished":"2020-09-23T18:14:37+00:00","dateModified":"2021-07-15T19:03:49+00:00","author":{"@id":"https:\/\/timesheet.dovico.com\/blog\/#\/schema\/person\/f3b591bcd0171f30ebf2582d9be2551d"},"description":"What is the project management triangle? Balancing time, costs and scope are three keys to project quality. Read more about the iron triangle","breadcrumb":{"@id":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#primaryimage","url":"https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-scaled.jpg","contentUrl":"https:\/\/timesheet.dovico.com\/blog\/wp-content\/uploads\/2020\/09\/What-is-the-iron-triangle-scaled.jpg","width":2560,"height":1442},{"@type":"BreadcrumbList","@id":"https:\/\/timesheet.dovico.com\/blog\/2020\/09\/23\/project-management-101-what-is-the-iron-triangle\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesheet.dovico.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Project Management 101: What is the Iron Triangle?"}]},{"@type":"WebSite","@id":"https:\/\/timesheet.dovico.com\/blog\/#website","url":"https:\/\/timesheet.dovico.com\/blog\/","name":"Dovico Blog","description":"Give Time Meaning.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesheet.dovico.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/timesheet.dovico.com\/blog\/#\/schema\/person\/f3b591bcd0171f30ebf2582d9be2551d","name":"Dovico","description":"Helping teams track time and manage projects since 1993. Dovico\u2019s timesheet software makes time tracking simple, insightful, and scalable. Learn more at dovico.com.","sameAs":["https:\/\/www.dovico.com"],"url":"https:\/\/timesheet.dovico.com\/blog\/author\/ejohnston\/"}]}},"_links":{"self":[{"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/posts\/4308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/comments?post=4308"}],"version-history":[{"count":14,"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/posts\/4308\/revisions"}],"predecessor-version":[{"id":4730,"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/posts\/4308\/revisions\/4730"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/media\/4321"}],"wp:attachment":[{"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/media?parent=4308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/categories?post=4308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesheet.dovico.com\/blog\/wp-json\/wp\/v2\/tags?post=4308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}